While we were assembling the next exterior wall, another group was assembling interior walls to be carried up. and raised it (shown in this short video). It was an odd wall that I haven't quite figured out. | ![]() |
![]() |
![]() |
![]() |
![]() |
After we put up the funky front facing exterior wall, we built a couple of interior walls to tie it with the next exterior wall. Here are a few pictures of Frank fastening the new walls. | ![]() |
![]() |
![]() |
![]() |
![]() |
Then we built the last exterior wall. Above is a picture of me using a nail gun to fasten the sheathing to the last wall. While I was fastening the last of the sheathing, others carried up the interior walls (also above). Then we added Tivek (the thin blue styrofoam sheets) and lifted the last wall into place as shown in the short video. The team along with the staff accomplished a lot. Below is Janice (from HR who helped set up much of the behind the scenes stuff for the day), Zak, and Dennis. | ![]() |
![]() |
![]() |